hydraulic electric powered lock 2 publish auo carry 4000 with CE
Attribute:
one. Pushed by double hydraulic cylinders, metal wire chain-type elevatingsystem
2. Oil cylinder parts made by computerized high rotation pace CNC lathe make certain
the outstanding complete and concentricity.
3. Automatic arm basic safety lock and hook variety post lock
4. CZPTal box manage equally side unlocked security, arm locks with tooth sort
ratchet, multi-protection gadget. far more dependable.
5. three-phase Screw-up pads ideal for minimal chassis motor vehicle as effectively as SUVs,
helps make effortless and fast service
six. CZPT opening security rubber as normal
7. CZPT reducing floor
8. Shot blasting and large temperature baking powder coated surface finish
nine. Japanese oil seal
Specification:
Lifting Potential | 4000kg |
Lifting Height | 1850mm |
Minimum Height | 110mm |
Lifting Time | 40-45s |
General Top | 2800mm |
Total Width | 3300mm |
Width In between Columns | 3175mm |
Motor Electricity | 2.2kw |
Power Source | 220V/380V/415V |
limited arm | 720mm-1110mm |
extended arm | 770-1240mm |
Similar item:
Model | Lifting capability | Lifting height | width amongst posts | All round height |
JH-4000FS | 4000kgs | 1800mm | 2930mm | 2794mm |
JH-4000F | 4000kgs | 1800mm | 3170mm | 2800mm |
JH-5000FS | 5000kgs | 1800mm | 3400mm | 2920mm |
Depth image:
Supply Date:
Normally it normally takes three weeks after receving your receipt payment .
Nonetheless, it would depend on our production line routine(the timing consumers spot purchase)and the complication of the merchandise.
Quality management:
To guarantee high quality and efficient management, we have passed CZPT quality management system certificate and the CE certification. All of our products are 100% inspected before shipment.Whole manufacturing processes are under a veryserious and strict system.
Company Introduction:
FAQ | |
Q1 | What is the delivery expression for generating organization with us? |
A | Generally we deliver the shipments in FOB phrase.Even so, the phrases of CIF and C&F are acceptable which count of customers. |
Q2 | What’s the supply time right after putting the get? |
A | Usually it takes 3 weeks after receving your receipt payment .Nevertheless, it would rely on our manufacturing line schedule(the timing customers location order)and the complication of the merchandise. |
Q3 | What’s the payment? |
A | By T/T, fifty% is paid out in progress equilibrium befor delivery |
This autumn | What’s the min get? |
A | one established. |
Q5 | What is actually the warranty? |
A | 1years for free of charge |