CZPT Hot Sale 3×9 5×15 6x18mm G80 CZPT Chain for Lifting
size dxp(mm) | width | Approx Weight(kg/m) | Working LoadLimit(t) |
Test Load(KN) | Breaking Load min. FN |
|
inside min.w1 | outside max. w3 | |||||
3×9 | 3.eight | 10.seven | .21 | .28 | 7.one | 11.3 |
4×12 | 5 | fourteen.3 | .35 | .five | twelve.6 | 20.one |
5×15 | 6.3 | 17.nine | .fifty four | .8 | 19.6 | 31.4 |
6×18 | 7.five | 21 | .seventy nine | 1.one | twelve.seven | 45.two |
six.3×19 | seven.9 | 22.6 | .86 | one.twenty five | 31.2 | forty nine.9 |
7×21 | nine | 24.five | 1.07 | 1.5 | 37 | 61.6 |
8×24 | 10 | 28 | one.38 | two | forty eight | eighty.4 |
9×27 | eleven.3 | 32.2 | 1.76 | two.5 | 63.six | 102 |
10×30 | 12.5 | 35 | two.two | 3.two | 76 | 125 |
eleven.2×33.6 | 14 | 40.1 | two.71 | 4 | 98.5 | 158 |
11×43 | twelve.six | 36.five | two.33 | 3.eight | ninety two | 154 |
12×36 | fifteen | forty two | three.one | 4.six | 109 | 181 |
12.5×38 | 15.5 | 42.two | 3.3 | 4.9 | 117 | 196 |
13×39 | sixteen.three | forty six | 3.eight | five | 128 | 214 |
14×42 | eighteen | 49 | 4.thirteen | 6.3 | a hundred and fifty | 250 |
14×50 | seventeen | forty eight | four | 6.three | a hundred and fifty | 250 |
15×46 | twenty | fifty two | 5.17 | 7 | 168 | 280 |
16×48 | 20 | 56 | five.sixty three | eight | 192 | 320 |
16×49 | 24.five | fifty nine.5 | five.seventy one | eight | 192 | 320 |
16×64 | 23.nine | fifty eight.9 | five.eleven | 8 | 192 | 320 |
18×54 | 23 | sixty three | six.85 | 10 | 246 | 410 |
18×54 | 21 | sixty | 6.6 | 10 | 246 | 410 |
19×57 | 23.seven | sixty three.2 | 7.seven | 11.3 | 270 | 450 |
20×60 | twenty five | 70 | eight.six | 12.5 | three hundred | five hundred |
22×65 | 28 | seventy four.2 | ten.seven | fifteen.3 | 366 | 610 |
22×66 | 28 | seventy seven | 10.2 | 15.three | 366 | 610 |
22×86 | 26 | 74 | nine.five | fifteen.3 | 366 | 610 |
24×72 | 32 | eighty two | twelve.78 | eighteen | 432 | 720 |
24×86 | 28 | 79 | 11.6 | eighteen | 432 | 720 |
26×78 | 35 | ninety one | fourteen.87 | 21.three | 510 | 720 |
26×92 | 30 | 86 | thirteen.seven | 21.three | 510 | 850 |
Payment
Payment time period | L/C | l/c quantity above 40.000 usd,we can acknowledge L/C at sight | |
T/T |
EXW | 30% T/T in progress,paid the stability prior to cargo |
|
FOB | |||
CIF | 30% T/T in progress,paid out the balance towards copy of B/L |
||
cfr(c&f) | |||
paypal | amount lower than 4000usd |
||
west |
Shipping time | fifteen~35days right after getting payment for 1 container |
We welcome use trade assurance,you`ll get pleasure from: one hundred% solution quality defense one hundred% on-time cargo protection one hundred% payment safety for your lined quantity |